1,Standard packing:plastic sheet wrapped for each profile in order to protect the profiles' surfaces,kraft paper wrapped in bundles.
2,Special packing: wooden cases+iron trays.
3,Bundles or boxes with wooden bars
4. EPE+carton boxes.
5,Customized packing methods are welcomed.
2) Competitive prices with short lead-time for both tooling and parts, because we do everything in-house.
3) Effective and strong technical support and excellent sales services.
4) Sufficient production capacity (only 65% occupied).
5) Efficient communication (48-hour quote lead time).
6) Compliant with RoHS Test.
Aluminium profile requirement:
Item
Original Product
Alternatives
Standard for Extrusion
GB /T5237-2000 (Chinese Standard)
EN-755-2/3/6/8, BS-1474, BS 1161 (British Standards) JIS H4100 (Japanese Standard) AS/NZS1866-1997 (Australian New Zealand Standard)
Standard for Fabrication
GB/T1804-92
BS 8118 TS1649
Standard for Anodizing
GB5237.2-2004
BS1615:1987 BS5599:1993 Mil-A-8625E Type II Mil-A-8625E Type III
Standard for Hard Anodizing
Not required
BS5599:1993
Standard for Powder coating
Not required
GB5237.4-2004
Working/Service procedure
Die designing→Die making→Smelting&alloying→Extruding→Cutting→CNC machining→Driling→Tapping→Surface treatment→Welding→Assembling→Packing→Shipping→After Sale Service
Quality oriented
ISO 9001:2008 TS16949:2002
Documents
Mill Certificates, RoHS, REACH(SVHC), Working Instructions, Inspection Instructions, Packing Instruction, PPAP(including Control Plan, PFMEA etc.), Unpacking/unloading Instructions for customers.
Packing Method
1,Standard packing:plastic sheet wrapped for each profile in order to protect the profiles' surfaces,kraft paper wrapped in bundles. 2,Special packing: wooden cases+iron trays. 3,Bundles or boxes with wooden bars
4. EPE+carton boxes. 5,Customized packing methods are welcomed.
Loading Weight
20'GP for 13tons, 40'GP for 20tons. LCL shipment will be acceptable.
Order,payment terms and shipment:
Minimum order
500kg per trial order.One piece of sample free of charge provided by approval and kept for future mass productin inspection,delivery fees on buyer.
Production Capacity
50,000 MT/Year
Tooling
Available
Sample Lead Time
15-25working days include 7-10 days making tooling if it's necessary
Production Lead time
15- 25 working days after deposit
Payment term
Tooling:100% prepaid by wire transfer.
Parts:30% upon order confirmation and balance before delivery by T/T.
Other payment terms can e discssed.
Shipping terms
FOB,CIF or others can be discussed.
Factory photos
Pls contact us for more detail information !
Look forward to meeting you at our following trade fairs
Global Sources Electronic Components Show
Date: April 11-14, 2016 Venue: AsiaWorld-Expo, Hong Kong